Skip to main content
Home
CEAPP

  • Home
  • Browse
  • Browse (ClassBank)
  • Actions and Practices
  • Search
  • Tutorials
  • Research
  • People
  • CRELLT

Breadcrumb

  1. Home
  2. Transcript Table

Transcript Table

Note: Lines that are metadata or do not contain timestamps are greyed out and do not have active links.

Results of Search: 176,291 lines — Showing 98481 - 98500.

Pagination

  • First page
  • Previous page
  • …
  • Page 4921
  • Page 4922
  • Page 4923
  • Page 4924
  • Page 4925
  • Page 4926
  • Page 4927
  • Page 4928
  • Page 4929
  • …
  • Next page
  • Last page
Course Level Date Clip# Line Interlocutor Content
Talkbank - - 2 72 EN2 uh (1.0) but uh, so, what do we do to strengthen this building?
Talkbank - - 2 73 EN2 now we're not e- y- and we're-, aiming at the general procedure.
Talkbank - - 2 74 UNK
Talkbank - - 2 75 EN2 well it seems to me that if we put (1.) a seismic resisting element
Talkbank - - 2 76 UNK he:re (1.0) or here, or he:re, somewhere in that area
Talkbank - - 2 77 UNK &=4 .
Talkbank - - 2 78 UNK %xco1:thumb and forefinger on a N-S region in south portion of plan
Talkbank - - 2 79 UNK
Talkbank - - 2 80 UNK %xco2:thumb and forefinger on a N-S region in north portion of
Talkbank - - 2 81 UNK plan
Talkbank - - 2 82 UNK %xco3:thumb and forefinger on a N-S region in north
Talkbank - - 2 83 UNK portion of plan, just to the left of location in action 3
Talkbank - - 2 84 UNK %xco4:thumb and forefinger slides back to south along same parallel≈
Talkbank - - 2 85 PR1 +≈ mm hmm≈
Talkbank - - 2 86 AR1 +≈ mm hmm.
Talkbank - - 2 87 EN1 we can (1.0) take force off of this wall.
Talkbank - - 2 88 UNK %xco1:right forefinger goes to region he just indicated where
Talkbank - - 2 89 UNK they could put an element
Talkbank - - 2 90 UNK %xco2:l hand with pointing finger moves along west wall
Talkbank - - 2 91 EN1 then we would reanalyze that wall using the, the.
  • Reset your password
Powered by Drupal